Case Study

Portadown Car Park 
Deck Refurbishment

Installed by: Milestone Flooring

Maintaining access throughout a critical refurbishment

Portadown Car Park is the principal parking facility serving Portadown Town Centre, providing essential access for shoppers, commuters and visitors. Due to its high daily usage, maintaining operational capacity throughout refurbishment was critical.

Although the existing waterproofing and deck protection system had only been installed six years prior, significant failures had developed — resulting in widespread defects and ongoing water ingress that required immediate remediation.

DekFast WPM 3 was selected for its proven durability, fast curing characteristics and suitability for high-traffic car park environments. The rapid curing PMMA system enabled efficient phased completion, minimising disruption to the town centre and ensuring the car park remained fully functional throughout the project.

Features & Benefits

  • Rapid curing fast-track installation
  • Excellent crack bridging properties
  • UV resistance
  • High chemical & mechanical resistance
  • Textured profile — excellent slip resistance
  • Versatile — wide range of colours
  • Easy maintenance & cleanability
  • Tested to EN1504-2 B4.2 (-20°C)

Project Details

Location

Portadown, N. Ireland

Installer

Milestone Flooring

Product

DekFast WPM3

System Type

PMMA deck coating

Total area

5,600m²

Phase coverage

4,000m²

Compliance

EN 1504-2 / OS10

Before & After

From widespread failure to full compliance

The existing deck had developed significant defects and water ingress within six years of the previous installation. DekFast WPM 3 delivered a fully compliant replacement system with zero closure time.

Before

Deck surface — widespread cracking and defects

After

Completed deck — DekFast WPM 3 with line markings

Project Outcome

A fully compliant solution with zero disruption

The Portadown Car Park refurbishment delivered a fully compliant, high-performance waterproofing and deck protection solution — extending the service life of the structure while maintaining public access throughout the works.

The rapid curing PMMA system enabled efficient phased completion, minimising disruption to the town centre and ensuring the car park remained functional during every stage of the project.

Related Case Studies

Discover more projects like this

Car Parking

Multi-storey deck refurbishment

Have a similar project?

Talk to our technical team about the right system for your car park or external deck.